Stacker/Reclaimer Project
Weyerhaeuser, Springfield, Oregon
Project Description
Installation of a Greenfield chip unloading, storage (stacking), reclaiming, and feed system.
Unloading - two 75' Phelps Industries truck dump systems feeding three Dimisa conveyors (930' total length).
Stacker/Reclaimer - FMW 360 degree stacker/reclaimer capable of stacking 6 million cubic feet of wood chips.
Feed System - one 874' under/above ground Dimisa conveyor from the reclaimer to the existing chip silos.
Service Provided
- Site preparation including installation of underground drainage and fire systems, dewatering, excavation for foundations, and paving
- Installation of 6700 yards of concrete and 275 tons of rebar for equipment foundations
- Fabrication and erection of 500 tons of structural steel for equipment
- Installation of 7500 lineal feet of service piping
- Installation of 300 lineal feet of underground tunnel
- Mechanical installation of equipment
- Fabrication and installation of miscellaneous platforms and structural supports
- Erection of masonry unit substation building and operators building
- Mechanical and piping tie-ins to existing facility
- Commissioning and start-up support
- On schedule
- Worked 90,000 safe hours
- Start date: April 2006
- Completion date: April 2007

“Greenberry receives three Top Project Awards”
Greenberry Industrial is a full service industrial general contractor and fabricator serving clients from our facilities in Corvallis and Portland, OR, Burlington, WA, and Ontario, CA. We manage or provide all structural, civil, and mechanical disciplines in industrial construction including boiler making, civil and concrete, heavy rigging, millwright and equipment setting, pipe spooling, and steel erection.