Henry Filter System Project
Boeing, Gresham, Oregon
Service Provided
- Worked in conjunction with owner to "value engineer" the most feasible plan for installation of the new equipment
- Design, engineer, fabricate, and erect monorail system to aid in installation of the new equipment.
- Coordination of electrical, sheet metal, fire suppression, and demolition subcontractors.
- Rigging and installation of new tanks, drag conveyor systems, and filtering system.
- Relocation of existing filter system
- Demolition of major section of wall and floor for installation of new equipment through the basement floor.
- Installation of new piping and instrumentation systems.
- Completion of all equipment installation, except tie-in's, in an operating facility without any process upsets.
- Work with factory representative in the commissioning of the new system.
- Shutdown tie-in of all conveyor, trough, and piping systems
- Work with plant engineers to minimize shutdown duration and maximize production time. By doing this we were able to knock 3 days off of a scheduled 5 day down.
- Ahead of schedule
- Under budget
- Start date: October 2006
- Completion date: January 2007
Greenberry Industrial is a full service mechanical industrial contractor serving clients from our facilities in Corvallis and Portland, Oregon. We manage or provide all structural, civil, and mechanical disciplines in industrial construction including boiler making, civil and concrete, heavy rigging, millwright and equipment setting, pipe spooling, and steel erection.