Petro/Chemical Projects
| Client | Projects |
|---|---|
| Tesoro Refinery Anacortes, WA |
Butane Railcar Unloading Project Completion date: January 2010 |
| Tesoro Refinery Anacortes, WA |
The Diesel Pour Point Project consisted of setting an Additive Tank and installing all peripheral process piping, valves, instrumentation and tie-ins. Greenberry fabricated all the pump and steam piping in the Burlington, WA shop, shipped to site and installed. Completion date: January 2010 |
| Tesoro Refinery Anacortes, WA |
Tank 165 Fire Foam system Completion date: January 2010 |
| Tesoro Refinery Anacortes, WA |
Misc. Small Capital Projects Completion date: Q3-2009 and ongoing |
| Shell Oil Terminal Portland, OR |
PDX Terminal B5 Project Completion date: September 2009 |
| Shell Pipeline Co. Seattle, WA |
Bio-fuels and Ethanol Upgrade Project Completion date: December 2008 |
| Sound Refining Tacoma, WA |
Bio-fuels and Ethanol Upgrade Project Completion August 2008 |
| Hexion Specialty Chemical LaGrande, OR |
Methanol containment and piping upgrades.
Completion date: 2006 |
| Hexion Specialty Chemical Missoula, MT |
Methanol containment and piping upgrades.
Completion date: 2006 |
| BOC Edwards Vancouver, WA |
Civil, structural, and mechanical upgrades. Fabrication of TCS pressure vessel.
Completion date: 2005 |
| Airgas Vancouver, WA |
Process and high pressure piping upgrades.
Completion date: 2005 |
| Hexion Specialty Chemical Springfield, OR |
Methanol containment and piping upgrades.
Completion date: 2004 |
| Shell Oil Co. Portland, OR |
Completion date: December 2003 |
Greenberry Industrial is a full service industrial general contractor and fabricator serving clients from our facilities in Corvallis and Portland, OR, Burlington, WA, and Ontario, CA. We manage or provide all structural, civil, and mechanical disciplines in industrial construction including boiler making, civil and concrete, heavy rigging, millwright and equipment setting, pipe spooling, and steel erection.




