Boiler Making

Civil & Concrete

Heavy Rigging

Instrumentation

Millwright & Equipment Install

Piping

Project Management

Steel Erection

Alternative Fuels

Energy

Federal

High-Technology

Petro/Chemical

Pulp & Paper

Food Processing

Material Handling

Army Corps. Of Engineers

Ash Grove Cement

Boise Paper Solutions

California Steel Industries

Conoco Phillips

Custom Bldg Products

Evergreen Pulp

Frontier Technology

Georgia Pacific

International Paper

Kodak

Lehigh

Longview Fibre

Morse Brothers

PacifiCorp

PPM Energy

Potlatch

Puget Sound Energy

Shell Oil Co.

Simpson Tacoma Kraft

Sound Refining

Temple Inland Paper

Tesoro

Tillamook Cheese

Toyocom

TransAlta

Turtle Mountain

US Army

Weyerhaeuser

Xerox

Yamasa

ProjectsProjectsProjectsProjects

California Steel Industries

Walking Beam Reheat Furnace
Fontana, California

Project Description

Installation of new 3,000,000 lb walking beam gas fired reheat furnace consisting of over 12,000 individual pieces. The furnace is used to reheat slabs of steel approximately 9" thick x 4' wide by 40' long weighing 40,000 lbs. The furnace is capable of reheating about 800 tons of steel to 2400 deg F per hour. The reheated steel is then rolled into plate steel.


MORE IMAGES WATCH VIDEO

 

Service Provided

  • Installed furnace structure with outside dimensions of 200'x 48' x 50' and weighing approximately 620 tons
  • Assembly and alignment of a 120 ton moving frame which is hydraulically lifted and pulled forward to walk the steel through the furnace
  • Installed 200 tons of structural steel for ducting, piping, and catwalk supports
  • Installed 240 tons of fabricated ducts for the furnace exhaust and recuperator
  • Installed over 18,000 lf of piping for hydraulics, water, natural gas, instrument air, and steam systems. Installed 915 valves in all the systems.
  • Installed 2150 lf combustion air duct system (12" - 60")
  • Installed eight 200-800hp air blowers
  • Installed 150' tall x 10' dia. refractory lined stack set (over 125,000 lb) in one piece at a 180' radius through the roof of the existing building
  • Assembled and installed recovery heat boiler to provide 100 lb. steam to the plant operations
  • Management of refractory subcontractor
  • Managed the installation of 520 tons of rammed plastic refractory
  • Managed the installation of 500 tons of castable refractory
  • Managed the installation of 920 tons of fire resistant brick
  • Managed the installation of insulation
  • Managed installation of 40,000 sq ft of aluminum cladded mineral wool insulation and 2000 sq ft of sewn blankets
  • Commissioning and start-up support.

Greenberry Industrial is a full service industrial general contractor and fabricator serving clients from our facilities in Corvallis and Portland, OR, Burlington, WA, and Ontario, CA. We manage or provide all structural, civil, and mechanical disciplines in industrial construction including boiler making, civil and concrete, heavy rigging, millwright and equipment setting, pipe spooling, and steel erection.